The city of Antwerp is expanding its territory by incorporating the old harbor zone.  Therefore the area is being redesigned with new infrastructure including better access by public transport such as trams.  An old mobile bridge was replaced by a wider one, giving space for the tram bed.  The bridge deck had to be jacked up to pass over the control tower nest to the bridge.

Scope:

  • Schrapping the old bridge
  • Transport of the new bridge from manufacturer to construction site
  • Installation of the new bridge deck and lifting beams

Provided services:

  • Heavy lifting
  • SPMT transports
  • RORO operations
  • Inland navigation
  • Jacking