One of the largest investments in the port of Antwerp between 2010 and 2020 was the Optara project at the Total Refinery.  With investments at different production plants in Europe, Antwerp took the biggest part of it.  Upgrading the factory and adapting the output to the current market took about 4 years of construction.

Scope:

  • Transport of main equip-ment and prefabricated modules from manufac-turer in Spain to Antwerp
  • Load-out at Port of Antwerp
  • Local transport to storage area at construction area
  • Lifting/putting down equipment at final installation spot

Provided services:

  • Load-in operations
  • Load-out operations
  • Heavy lifting
  • SPMT transports
  • Project Scheduling